Back to Blog
Factory Tour

Inside a Spray Bottle Factory: Complete Manufacturing Process from Raw Plastic to Finished Product

Desikyspray Production TeamJuly 14, 20268 min read
manufacturing processfactory tourinjection moldingblow moldingproduction

The Production Journey: 7 Stages

Stage 1: Raw Material Receiving

Virgin PET/HDPE/PP granules arrive in 25kg bags from Sinopec and PetroChina. Material certificates verified against order specification. Granules stored in climate-controlled silos to prevent moisture absorption (critical for PET).

Stage 2: Injection Molding (Caps, Closures, Pump Parts)

Granules fed into injection molding machines (80-320 ton clamping force). Heated to 230-280°C (varies by plastic type). Injected into steel molds at high pressure (800-1,200 bar). Cycle time: 15-30 seconds per shot. Multi-cavity molds produce 4-16 caps per cycle.

Stage 3: Blow Molding (Bottle Bodies)

PET preforms (test-tube shaped) heated in infrared oven to 100-120°C. Stretch blow molded: rod stretches preform while high-pressure air (30-40 bar) inflates it into bottle mold. Cycle time: 8-15 seconds. HDPE/PP bottles use extrusion blow molding — parison extruded, mold closes, air inflates.

ProcessMaterialCycle Time
Injection Stretch Blow Molding (ISBM)PET8-15 sec
Extrusion Blow Molding (EBM)HDPE, PP10-20 sec
Injection MoldingPP (caps, pumps)15-30 sec

Stage 4: Assembly

Bottle body + spray pump + dip tube + cap assembled on automated lines. Dip tube cut to length, inserted into pump. Pump screwed onto bottle. Cap applied. Speed: 2,000-5,000 units/hour per line.

Stage 5: 100% Leak Testing

Every unit passes through vacuum leak tester: -0.05 MPa for 5 seconds. Cameras monitor for air bubbles. Failed units automatically rejected to rework bin. Zero tolerance for leaks.

Stage 6: Printing & Decoration

Silk screen printing: 1-3 colors applied through mesh screens, UV-cured. Hot stamping: metallic foil heat-pressed. Speed: 2,000-4,000 units/hour. Quality check: random sampling for print alignment and adhesion rub test.

Stage 7: Packaging & QC Inspection

Individual poly bag, bulk packed in export cartons. AQL 2.5 sampling inspection: visual, dimensional, functional. Cartons labeled with PO number, quantity, destination. Palletized, stretch-wrapped, ready for container loading.

FAQ

How long does production take?

Standard stock products: 5-10 days. Custom color/logo: 20-25 days. Custom mold: 50-65 days including mold fabrication. Rush orders available at +15-20% surcharge.

Can I visit the factory?

Absolutely. Desikyspray welcomes factory visits. Ningbo airport is 1 hour away. We can arrange airport pickup and hotel. Seeing the production line builds trust that no video call can replace.

Related Articles: How to Choose a Supplier on Alibaba · OEM Custom Manufacturing Guide · Samples Guide: Testing & Approval · Cosmetic Bottle Wholesale Guide

Looking for a Reliable Spray Bottle Manufacturer?

Skip the research — talk directly to our factory. Free samples and quotes within 24 hours.